IEEE 519-2022 provides that when fewer than twelve months of service exist the available months are averaged, and that for a proposed installation the maximum demand load current is based on the projected maximum monthly apparent power demand over the first year of operation of the proposed harmonic producing loads.

ProvenanceIEEE 519-2022 supports data record qty.maximum-demand-load-current.ieee519.new-installation, which is cited on the entry Maximum demand load current.SOURCEIEEE 519-2022IEEE 519-2022Licensed standard, clause 3.1DATA RECORDqty.maximum-demand-load-current.ieee519.new-installationqty.maximum-demand-load-..Verified 2026-10-27ENTRYMaximum demand load currentMaximum demand load curr..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceIEEE 519-2022Licensed standard, clause 3.1
Data recordqty.maximum-demand-load-current.ieee519.new-installationVerified 2026-10-27
EntryMaximum demand load currentNo revisions
Subject
Maximum demand load current (Quantities, units and formulas)
Kind
Definition
Source
IEEE 519-2022, clause 3.1, Harmonic Control in Electric Power Systems, IEEE. Publisher pagePublisher information page

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-27created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record qty.maximum-demand-load-current.ieee519.new-installation." Power Quality Reference. 2026-10-27. https://www.powerqualityreference.com/data/qty.maximum-demand-load-current.ieee519.new-installation/.