Data record tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required
Verified 2026-10-24 Confidence: High
Commissioning test CT4 in clause 8.2.3.4 of IEEE 1547.1-2020, the power quality test, is required when issues arise at commissioning, when the design evaluation calls for it or when the Area EPS operator requires it, and its test cases (startup, disconnection, the full output range, input variation and nearby facilities) are agreed with the Area EPS operator. Measurements are taken at the PCC, except that dc injection and current distortion may be measured at the reference point of applicability, with an instrument of the Class A performance class defined in the IEC power quality measurement methods standard.
| Step | Item | Detail |
|---|---|---|
| Source | IEEE 1547.1-2020 | Licensed standard, clause 8.2.3.4 |
| Data record | tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required | Verified 2026-10-24 |
| Entry | Power Quality and Harmonic Survey | No revisions |
- Subject
- Power Quality and Harmonic Survey (Test methods)
- Kind
- Method fact
- Source
- IEEE 1547.1-2020, clause 8.2.3.4, Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources, IEEE.
History
| Date | Change |
|---|---|
| 2026-10-24 | created |
| 2026-10-24 | revised |
| 2026-10-24 | review_status unreviewed -> software_reviewed |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required." Power Quality Reference. 2026-10-24. https://www.powerqualityreference.com/data/tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required/.
Power Quality Reference, Data record tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required (Oct. 24, 2026), https://www.powerqualityreference.com/data/tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required/.
@misc{etr-data-tests-power-quality-and-harmonic-survey-ieee1547-1-commissioning-when-required,
title = {Data record tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required},
howpublished = {\url{https://www.powerqualityreference.com/data/tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required/}},
organization = {Power Quality Reference},
publisher = {Power Quality Reference},
year = {2026},
note = {last substantive change 2026-10-24}
}{{cite web |title=Data record tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required |website=Power Quality Reference |publisher=Power Quality Reference |url=https://www.powerqualityreference.com/data/tests.power-quality-and-harmonic-survey.ieee1547-1.commissioning-when-required/ |date=2026-10-24 |access-date=}}