Data record std.ieee-519.structure.current-limit-bands

Verified 2026-10-27 Confidence: Medium

Clause 5.3, clause 5.4 and clause 5.5 of IEEE 519-2022 are three parallel subclauses, one per nominal system voltage band at the point of common coupling, each applying three statistical tests to the harmonic currents of a user and each stating that the limits evaluate the installation containing the nonlinear loads rather than any individual nonlinear load.

ProvenanceIEEE 519-2022 supports data record std.ieee-519.structure.current-limit-bands, which is cited on the entry IEEE Standard for Harmonic Control in Electric Power Systems.SOURCEIEEE 519-2022IEEE 519-2022Licensed standard, clause 5.3DATA RECORDstd.ieee-519.structure.current-limit-bandsstd.ieee-519.structure.c..Verified 2026-10-27ENTRYIEEE Standard for Harmonic Control in Electric Power SystemsIEEE Standard for Harmon..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceIEEE 519-2022Licensed standard, clause 5.3
Data recordstd.ieee-519.structure.current-limit-bandsVerified 2026-10-27
EntryIEEE Standard for Harmonic Control in Electric Power SystemsNo revisions
Subject
IEEE Standard for Harmonic Control in Electric Power Systems (Standards)
Kind
Standard scope
Source
IEEE 519-2022, clause 5.3, Harmonic Control in Electric Power Systems, IEEE. Publisher pagePublisher information page

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-27created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record std.ieee-519.structure.current-limit-bands." Power Quality Reference. 2026-10-27. https://www.powerqualityreference.com/data/std.ieee-519.structure.current-limit-bands/.